Mon–Fri 7:00am–6:00pm · 24/7 emergency service

Call us: 866 344 8295

ROUGH-IN PLUMBING

Commercial rough-in plumbing contractor

Rough-in is the part of the job nobody sees and everybody pays for twice if it is wrong. We set it to the drawings, test it, and get it inspected before a single sheet of drywall goes up.
Home  /  Commercial Rough-In Plumbing Contractor
THE STAGE THAT DECIDES THE JOB

Everything after rough-in is finish work

Rough-in covers all the piping that ends up buried: under the slab, in the walls, above the ceiling. Once concrete is poured and drywall is hung, changing any of it means demolition, so rough-in is where accuracy is worth more than speed.

The work splits into two blocks. Underground rough-in is sanitary and vent piping set to grade beneath the slab, which has to be inspected and backfilled before the pour. Above-slab rough-in is waste, vent, water and gas run through walls and ceilings, which has to be tested and inspected before the walls close.

Both blocks are hold points on the schedule, and both are inspected. We build the dimensional layout off the fixture and equipment plan, verify it against the architectural dimensions, and mark the deck before we cut, because a fixture that lands two inches off a carrier is a wall that comes back apart.

What rough-in includes

ROUGH-IN WORK

What we install at rough-in

Dimensional layout

Fixture and equipment centerlines transferred from the drawings to the slab and the framing, checked against architectural dimensions before anything is cut.

Underground sanitary and vent

Trenched, bedded and set to grade with the required fall, joints made up and supported, then tested, inspected and backfilled ahead of the pour.

In-wall waste and vent

Stacks, branch waste, vents and carriers set in the framing at the right height and depth for the specified fixtures and the finished wall thickness.

Water piping

Hot, cold and recirculated water run through walls and above ceiling, supported and sleeved correctly, with isolation valves where they can actually be reached later.

Gas rough-in

Black iron or approved piping from the meter to the equipment locations, supported and sealed, then pressure-tested for the duration the jurisdiction requires.

Testing and inspection

Air or hydrostatic testing held at pressure for the inspection, with the test results and the sign-off documented for the closeout package.

THE TWO GATES

How rough-in is sequenced

01

Verify before you cut

Existing invert, slab thickness, post-tension cables and conduit runs are confirmed and scanned before saw cutting. Cutting blind into a post-tensioned slab is the most expensive mistake on the job.
02

Underground installation

Trench, bed, pipe, support and make up joints, with cleanouts located so they remain accessible once partitions and casework are in.
03

Underground test and inspection

The system is filled or pressurized and held for the inspector. Only after sign-off does backfill and compaction happen, then the slab pour.
04

Above-slab rough-in

Waste, vent, water and gas set in walls and above ceilings, coordinated with ductwork and conduit so nothing has to be re-routed later.
05

Rough-in test and inspection

Second pressure test and inspection, with carriers, backing and fixture heights verified against the accessibility requirements before the walls close.
06

Protect and hand over

Open ends capped, stub-outs protected from drywall and flooring trades, and the rough-in photographed and marked up for the as-builts.
COMMON QUESTIONS

Rough-in plumbing questions

If your question is not here, call and ask for an estimator.

Underground rough-in is the sanitary and vent piping beneath the slab, installed and inspected before the concrete is poured. Above-slab rough-in is everything in the walls and ceiling — waste, vent, water and gas — installed and inspected before drywall. They are separate inspections and separate schedule gates.

By scanning first. We locate post-tension cables, rebar and embedded conduit with ground-penetrating radar or equivalent before any saw cutting, and we mark and document what we find. On post-tensioned slabs this is not optional.

The work is corrected and re-inspected, which costs days rather than hours because inspection slots are scheduled. That is why we pre-test everything ourselves and walk the rough-in against the drawings before we call for the inspection.

No. Underground and rough-in are both inspected work, and installing them without an issued permit risks having to open up finished work later. We use the permit window to release long-lead equipment and complete layout instead.

From the applicable accessibility standard and the specified fixture’s rough-in dimensions, measured to the finished floor and finished wall rather than to the substrate. Getting this wrong is one of the most common causes of a failed final inspection.

Get the rough-in scoped and scheduled

Send the plumbing drawings and the fixture schedule. We will confirm the layout and give you the inspection dates to plan around.