Mon–Fri 7:00am–6:00pm · 24/7 emergency service

Call us: 866 344 8295

FIT-OUT PLUMBING

Tenant fit-out plumbing services

Fit-out work lives between the landlord’s base building and the tenant’s requirements. We handle the plumbing on both sides of that line — the tie-ins, the suite distribution and the coordination that keeps the building team happy.
Home  /  Tenant Fit-Out Plumbing Services
BASE BUILDING VS TENANT WORK

Fit-out plumbing starts with a boundary question

Every fit-out begins with the same question: where does the base building stop and the tenant work start? The answer is in the work letter, and it decides who pays for the water service, the sanitary stub, the vent penetration and the common restrooms.

We read that document before pricing. If the base building is supposed to deliver a two-inch water service at the demising wall and it has delivered a capped one-inch line, that is a landlord item, and finding it during the walk is worth considerably more than finding it during rough-in.

From there the fit-out plumbing is suite work: distributing water, waste, vent and gas through the new layout, building or altering restrooms, serving pantries and break rooms, and connecting whatever specialty equipment the tenant is bringing in.

Typical fit-out plumbing items

FIT-OUT SERVICES

What we deliver on a fit-out

Base-building tie-ins

Connecting to the riser, the sanitary stub and the gas outlet the building provides, with the shutdown scheduled and noticed so other tenants are not affected.

Suite distribution

Water, waste, vent and gas routed through the new plan, above ceiling and in wall, coordinated with the ductwork and lighting layout.

Pantries and break rooms

Sinks, dishwashers, filtered water, coffee equipment and refrigerator lines, with the drainage and indirect waste those appliances need.

Restroom work

New suite restrooms or alterations to existing ones, with accessible clearances, correct mounting heights and carriers set to the specified fixtures.

Metering and isolation

Sub-meters where the lease requires them, and isolation valving that lets the suite be shut down without taking the floor or the riser out of service.

Landlord coordination

Building-management notices, certificates of insurance, after-hours work windows and riser access arranged in advance rather than on the day.

FIT-OUT PROCESS

How a fit-out runs

01

Work letter and base-building review

We establish the boundary in writing and verify on site that the base building has actually delivered what the work letter promises.
02

Survey the risers and points of connection

Riser locations, available capacity, existing invert and shutdown constraints are confirmed, because they set the routing for everything else.
03

Estimate with landlord items separated

Tenant scope and any landlord-responsibility items are priced as separate lines so the TI allowance is applied to the right work.
04

Permit and building approvals

The municipal permit runs alongside the landlord’s own construction approval, which many buildings require before any work starts.
05

Install around the occupied building

Noisy and disruptive work is scheduled to the building’s rules, with tie-ins and shutdowns after hours where the riser serves other tenants.
06

Inspection, certification and turnover

Final inspection, backflow certification, and a closeout package sent to both the tenant and building management.
COMMON QUESTIONS

Fit-out plumbing questions

If your question is not here, call and ask for an estimator.

In practice they describe the same work, and the terms are used interchangeably in most US markets. “Fit-out” is used more often for office space inside multi-tenant buildings, and “tenant improvement” more often for retail and standalone suites, but the scope and the process are the same.

Normally the landlord, if the work letter says the base building provides a service of a given size and it does not. If the tenant’s use requires more than the base building was ever meant to deliver, that upgrade usually falls to the tenant. Either way it is worth settling before the lease is signed.

Yes. Riser tie-ins, shutdowns and any work that affects other tenants are normally scheduled outside business hours, with the notice period the building requires. We carry that cost in the estimate rather than raising it later.

Almost always. Most multi-tenant buildings require the landlord to approve the construction documents and the contractor before work starts, in addition to the municipal permit. The two reviews can run in parallel.

It can. If the fit-out increases occupancy beyond what the existing fixture count supports, or if the path of travel to the common restrooms is not accessible, the project may have to address it. We flag this during the walk so it is in the budget from the start.

Scope the fit-out plumbing

Send the work letter and the proposed plan. We will separate the landlord items from the tenant scope and price both.